A fixed fee, all year
Paid every month for the space, whether or not the computer is busy.
Solar Inference · Compute at home
We place quiet, datacenter-class AI computers in the yards of homes with power to spare. The home gets a fixed monthly fee, heat in winter and backup power in an outage. We handle the rest.
A concept in development in New Jersey. Figures are estimates, not promises.
Why now
Datacenters wait years for a grid connection. Homes already have service they rarely use in full.
Amazon says AWS computing capacity is largely sold out through 2027, and a good part of 2028.
Reuters, October 2026
The median rental price for one NVIDIA B300 GPU-hour on October 25, up 12% in 90 days.
GetDeploying, October 2026
The average U.S. wait for a new datacenter’s grid connection.
JLL Global Data Center Outlook, 2026
How much of its electrical capacity the average American home uses.
Span, via Fortune, May 2026
The node
One datacenter-class server in a sealed, cooled enclosure about the size of an air-conditioning unit. We own it, install it, insure it and run it remotely. AI teams rent its computing by the hour.
It sits behind its own meter and its own internet line, and never touches the home’s network.
Targets for the first enclosure, not a finished product.
What the home gets
The node earns its keep for the house as well as for us.
Paid every month for the space, whether or not the computer is busy.
About 15 kW of heat around the clock. Piped into the house, it can carry much of the winter heating.
A battery in the enclosure backs up the house. In an outage the computer steps aside and the house gets the power.
Runs on the home’s solar when the sun is up, and may qualify for clean-energy incentives a household can’t claim alone.
How it pays
AI teams rent GPU time by the hour, online.
Match renters to machines and keep a share of each hour.
Owns and runs the node. Pays for hardware, power, internet, insurance and upkeep.
A fixed monthly fee, winter heat and backup power.
It doesn’t rise or fall with rentals. The market risk stays with us, not with the home.
Every site carries fixed costs: its internet line, insurance, installation and visits. A datacenter-class node earns enough to carry them. A small one doesn’t.
Hosting a node
Permission
Most town codes never imagined a computer in the back yard. We take that on ourselves, one town at a time.
Home-business rules, accessory equipment, and any data-center definition or ban.
That the unit is accessory equipment, like a generator or an AC condenser.
Setbacks, screening, permits, and the night noise limit at the property line.
Work with the town on a simple standard for home compute, as towns did for solar.
The field
Big players are betting that homes have power to spare.
California
Liquid-cooled compute nodes about the size of an air-conditioning unit, outside new homes. Prototypes running since May 2026.
United Kingdom
Servers on home hot-water tanks. The computing heats the water, so the household gets free hot water. About 100 homes so far.
New Jersey
Already renting datacenter-grade GPUs online from a home server room. Next: one large node, then host homes in existing neighborhoods.
Where we are
GPU servers in a home server room, rented by AI teams most of the time since summer 2026.
Our own monitoring, pricing and power control, around the clock.
What power, heat and noise teach you at home scale, before you build anything bigger.
Questions
It’s designed to stay under New Jersey’s night limit at the property line, 50 decibels, about the sound of a quiet office.
The battery backs up the house. The computer shuts itself down first, so the house gets the power.
Listed equipment on its own circuits, watched around the clock for heat and smoke, with remote shutoff. We insure it, and our liability policy covers the home.
No. It has its own fiber line and never joins the home network. We never look at what customers run on it.
No. The node’s power is on its own meter or included in our fee, never on the household’s bill.
No. We monitor and repair it remotely, with a few scheduled visits a year. You only keep the circuit on and let us in on notice.
The agreement ends, and we remove the box within days.
That’s the first thing we check. If your town’s code is silent, we ask for a ruling. If it has banned data centers, we won’t place a node there.
Interested in hosting a node, or in bringing this to your town? We’d like to hear from you.
admin@solarinference.com